i'm finding the ocg for ccnp switch to be a little soft (not specific enough) in areas that are vital to the goals and objectives as outlined by the blueprint below... from https://learningnetwork.cisco.com/docs/DOC-6566
it will be useful to attack each of these one at a time... other useful information can be found here as well...
http://dhucaby.wordpress.com/2010/06/04/ccnp-switch-planning-topics/#more-70
642-813 SWITCH Exam Topics (Blueprint)
Implement VLAN based solution, given a network design and a set of requirements
Determine network resources needed for implementing a VLAN based solution on a network
Create a VLAN based implementation plan
Create a VLAN based verification plan
Configure switch-to-switch connectivity for the VLAN based solution
Configure loop prevention for the VLAN based solution
Configure Access Ports for the VLAN based solution
Verify the VLAN based solution was implemented properly using show and debug commands
Document the verification after implementing a VLAN solution
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
Determine network resources needed for implementing a Security solution
Create a implementation plan for the Security solution
Create a verification plan for the Security solution
Configure port security features
Configure general switch security features
Configure private VLANs
Configure VACL and PACL
Verify the Security based solution was implemented properly using show and debug commands
Document the verification results after implementing a Security solution
Implement Switch based Layer 3 services, given a network design and a set of requirements
Determine network resources needed for implementing a Switch based Layer 3 solution
Create an implementation plan for the Switch based Layer 3 solution
Create a verification plan for the Switch based Layer 3 solution
Configure routing interfaces
Configure Layer 3 Security
Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
Document the verification results after implementing a Switch based Layer 3 solution
Prepare infrastructure to support advanced services
Implement a Wireless Extension of a Layer 2 solution
Implement a VoIP support solution
Implement video support solution
Implement High Availability, given a network design and a set of requirements
Determine network resources needed for implementing High Availability on a network
Create a High Availability implementation plan
Create a High Availability verification plan
Implement first hop redundancy protocols
Implement switch supervisor redundancy
Verify High Availability solution was implemented properly using show and debug commands
Document results of High Availability implementation and verification
No comments:
Post a Comment