Pages

network cisco ccna gns3 certification arteq

network cisco ccna gns3 certification arteq
a network runs through it

Search insearchofthecert

Friday, April 6, 2012

switch ocg...

i'm finding the ocg for ccnp switch to be a little soft (not specific enough) in areas that are vital to the goals and objectives as outlined by the blueprint below... from https://learningnetwork.cisco.com/docs/DOC-6566
it will be useful to attack each of these one at a time... other useful information can be found here as well...
http://dhucaby.wordpress.com/2010/06/04/ccnp-switch-planning-topics/#more-70

642-813 SWITCH Exam Topics (Blueprint)



Implement VLAN based solution, given a network design and a set of requirements

Determine network resources needed for implementing a VLAN based solution on a network

Create a VLAN based implementation plan

Create a VLAN based verification plan

Configure switch-to-switch connectivity for the VLAN based solution

Configure loop prevention for the VLAN based solution

Configure Access Ports for the VLAN based solution

Verify the VLAN based solution was implemented properly using show and debug commands

Document the verification after implementing a VLAN solution



Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements

Determine network resources needed for implementing a Security solution

Create a implementation plan for the Security solution

Create a verification plan for the Security solution

Configure port security features

Configure general switch security features

Configure private VLANs

Configure VACL and PACL

Verify the Security based solution was implemented properly using show and debug commands

Document the verification results after implementing a Security solution



Implement Switch based Layer 3 services, given a network design and a set of requirements

Determine network resources needed for implementing a Switch based Layer 3 solution

Create an implementation plan for the Switch based Layer 3 solution

Create a verification plan for the Switch based Layer 3 solution

Configure routing interfaces

Configure Layer 3 Security

Verify the Switch based Layer 3 solution was implemented properly using show and debug commands

Document the verification results after implementing a Switch based Layer 3 solution



Prepare infrastructure to support advanced services

Implement a Wireless Extension of a Layer 2 solution

Implement a VoIP support solution

Implement video support solution



Implement High Availability, given a network design and a set of requirements

Determine network resources needed for implementing High Availability on a network

Create a High Availability implementation plan

Create a High Availability verification plan

Implement first hop redundancy protocols

Implement switch supervisor redundancy

Verify High Availability solution was implemented properly using show and debug commands

Document results of High Availability implementation and verification

No comments:

Post a Comment